Orleans Conservation Commission                                 

Work Meeting    Nauset Room                     March 23, 2010
8:30 a.m.       Call to Order   


Continuation
Mary Allen Bradley                                      4 Etta’s Way
Last heard: 2/2/10
by Ryder & Wilcox, Inc.  Assessor’s Map 55, Parcel 28.  The proposed construction of a detached garage/studio & a flagstone patio & walkway. Work will occur within 100’ of a Coastal Bank.


Certificates of Compliance
Haskell (Quinn) 2005                                    10 Locust Road
Request for a COC for an Order for a dwelling that was conditioned on a Mitigation Planting Plan and also to remove debris from a wetland.  An As-Built Plan has been submitted showing a slightly larger deck and 3 air-conditioning units. The debris has been removed from the wetland but only a grassy buffer has been put in, not a shrub border. An open area has been left in the plantings around the culvert for the Highway Department to service the culvert.

Peedin (Scott) 1995                                     40 Gibson Road
Request for a COC for an Order for a dwelling. An As-Built Plan has been submitted showing the current configuration of the shell driveway, an additional stonewall off the northeast side of the dwelling, and that the existing shed and propane tank have been removed.

Michael Schumaecker (2005)                              161 Monument Road
Request for a COC for an Order for vegetation restoration, an addition, two decks, and a stairway. The addition and one of the decks were not built. They have re-filed (please see the Site Visits).  The plantings are doing well.


Administrative Reviews
Pochet Property Owners Association                      Pochet Road     
Request to realign and level 20’ of existing raised bridge and the entire span of walkway without a railing. Request to introduce 4 pairs of 6” x 6” supports at the start of the walkway that are much longer than the existing pilings for stabilization.  Work by Anchor Marine.

Richard Beaulieu                                                33 Herring Brook Road
Request to replace a pier, including the pilings, according to the License. Work by Ames Marine.

Tom Heiser                                                      27 Carlton Road
Clifford Hampton                                                40 Carlton Road
Request to reinstall the top row of gabions displaced by a recent storm to its original height and contour, not to exceed the original elevation. The gabions on the beach will be picked up and reinstalled. Gabions that have lost their rocks will be replaced with larger rocks. Replenishment of the lost portion of the toe will be with compatible sand fill, approximately 20 cubic yards. The area will be replanted with native grasses such as beach grass and stiff-leaf quack grass. No regrading or contouring of the hillside or removal of any other vegetation will take place. Access will be via the East Egg project 19, 21 Little Bay Road during the construction of their gabions.  Work by Anchor Marine.

Robert Payne                                            71 Towhee Lane
Request to replenish the toe of the bank with clean compatible sand fill and plant beach grass. Approximately 100 cubic yards of fill will be used. Access will be via the adjacent level lot owned by his brother. Sand fill will be dumped at that lot and transported with a rubber tire front end loader and placed on the toe of the bank. Work by Anchor Marine.

Town of Orleans Parks Department                        Nauset Beach
Request to build a 12’ x 25’8” addition to the Park Department office building at Nauset Beach. The addition will be located over existing pavement.

William Garner                                          176 Namequoit Road
Request to upgrade the septic system. The limit of work extends within the 100 foot buffer from the top of a coastal bank for piping, and for filling and abandoning the old system. The limit of work is also slightly within 100’ to an old bog that is a Certified vernal pool.

Robert Campbell                                         76 Freeman Lane
Request to remove one red cedar that is ready to fall over at the bottom of the coastal bank. Work by Bruce McCutcheon.

St. Joan of Arc Church                                  68 Canal Road
Request to raise an entryway roof 18” over a rear entrance to prevent ice dams.

Chairman’s Business
Approval of the Minutes from the Hearing/ Work Meeting on March 16, 2010.


Other Member’s Business


Administrator’s Business


Site Visits
Notices of Intent
Richard Thompson                                                24 Priscilla Road
by Ryder & Wilcox, Inc. Assessor’s Map 13, Parcel 89.  The proposed construction of additions to an existing dwelling. Work will occur within 100’ of 2 Freshwater Wetlands.

Rebuck/Peedin                                           40 Gibson Road
by Ryder & Wilcox, Inc. Assessor’s Map 19, Parcel 23. The proposed renovations to an existing dwelling; second-story dormers, new doors & windows; & a stone retaining wall. Work will occur within 100’ of the Top of a Coastal Bank.  

Brooks Thayer Tr.                                               10 Thayer Lane
by Ryder & Wilcox, Inc. Assessor’s Map 70, Parcel 3. The proposed repairs to a boathouse, including a new foundation in the existing footprint. Work will occur on a Coastal Bank & within the Pleasant Bay ACEC.

Thomas Campbell                                         72 Gibson Road
by Eastward Companies. Assessor’s Map 11, Parcel 11. The proposed installation of a gas line; replacing & expanding an existing porch, front walk, & rear patio. Work will occur within 100’ of the Top of a Coastal Bank.

Michael Schumaecker                                     161 Monument Road
by J.C. Ellis Design Co., Inc. Assessor’s Map 55, Parcel 58.  The proposed construction of an addition. Work will occur within 100’ of the Top of a Coastal Bank.   

Amended Order
Kathi Whitaker                                          77 Towhee Lane
by Ryder & Wilcox, Inc. Assessor’s Map 93, Parcel 4.  The Order is proposed to be amended to plant recently eroded areas & repair the stairway. Work will occur on a Coastal Bank.